LexiTalk LexiTalk

Latihan IELTS Speaking: Team Meeting: Deciding on a Risky Change

Di LexiTalk, Anda mengenal bahasa Inggris alami lewat konten listening ber-konteks nyata. Dengan terus mendengar, mengulang, dan memakai konteks yang sama, respons mendengar dan berbicara terbentuk.

Dengarkan dan Bicara Main mini game kosakata 📱 Unduh aplikasi Mengapa belajar lewat brain routes, bukan lewat terjemahan?
Team Meeting: Deciding on a Risky Change - Advanced English Learning Podcast - LexiTalk
🔥 Advanced · IELTS · B2 · 2025.12.05 · 1m1s

🎧 Latihan IELTS Mendengar & Berbicara

0:00 / 0:00
Metode mendengarkan lima putaran

Ubah satu konten listening menjadi input bahasa Inggris yang bisa dipakai ulang

Jangan berhenti di satu kali putar. Bagi episode yang sama menjadi lima putaran: pahami inti dulu, lalu dukungan bahasa, shadowing, dikte, dan terakhir dengarkan ulang tanpa subtitle.

Putaran 1

Dengar tanpa subtitle

Pahami gambaran besar, topik, dan informasi utama tanpa subtitle.

Putaran 2

Subtitle Inggris

Pahami kata yang belum dikenal dan kalimat yang sulit. Gunakan kamus dan catatan singkat bila perlu.

Putaran 3

Shadowing

Ikuti kalimat demi kalimat dan tirukan pengucapan, ritme, tekanan, dan intonasi.

Putaran 4

Dikte

Tulis beberapa kalimat penting dari yang Anda dengar untuk melatih bentuk dan struktur.

Putaran 5

Dengar ulang tanpa subtitle

Dengarkan lagi tanpa bantuan teks dan perhatikan apa yang sekarang terasa lebih jelas.

Setelah latihan

Bagikan dan ceritakan ulang

Bagikan catatan, kosakata baru, atau satu konsep yang berguna, lalu ceritakan ulang episode dengan kata-kata Anda sendiri.

Langkah berikutnya

Dari intensive ke extensive

Gunakan kembali episode yang sudah dipelajari secara intensif sebagai bahan dengar latar dan tambah volume dengan materi yang familiar.

Putaran 1Putaran 2Putaran 3Putaran 4Putaran 5

📝 Transkrip Dialog IELTS Speaking

Project Manager: Good morning. Thanks for joining on short notice. Team Lead: Morning. No problem. I grabbed a coffee on the way. Project Manager: Was the client told about the delay? Team Lead: Not formally. I sent a quick note, but I didn’t get confirmation. Project Manager: We might have to roll the dice if we push the integration without testing. Team Lead: I agree. We can't just roll the dice and hope for the best. Project Manager: Was the prototype issue the same one fiz flagged last week? Team Lead: Yes, fiz reported a timing bug in the logging module. Project Manager: I tried calling fiz yesterday and left a message. Team Lead: Good. We should also add a short test to mitigate that risk. Project Manager: If the budget is tight, adding tests might delay delivery, though. Team Lead: True, but skipping tests is risky. It could cause rework that costs more. Project Manager: So are you suggesting we contact the client and ask for a small extension? Team Lead: Yes. If we explain the potential impact, they may prefer a short delay to avoid failures. Project Manager: Alright. I'll draft an email and follow up with fiz for the exact error details. Team Lead: Perfect. I can prepare the additional test cases this afternoon.

📝 📚 Soal Latihan IELTS

1

Who reported the timing bug in the logging module?

2

What does the Project Manager plan to do after the meeting?

3

How do the speakers feel about skipping tests?

4

Why does the Team Lead suggest contacting the client?

5

What does 'mitigate' most nearly mean as used in the conversation?

6

Which of the following is a factual detail mentioned in the meeting?

7

What can be inferred about the project's deadline situation?

Ubah Mendengarkan menjadi Berbicara

Dapatkan umpan balik instan dan latihan harian di app LexiTalk.

Unduh App

Cookie

Kami menggunakan cookie untuk fungsi penting, analitik, dan iklan. Anda dapat menerima, menolak, atau mengelola preferensi. Kebijakan Privasi

Dukungan